Wooden house 2 – Creative

  • Modern, timeless in design, 4-room ground family house suitable for 4-5-member family
  • Suitable for a flat or slightly sloping spacious sunny land
  • Quick and surroundings saving construction thanks to the all-wall sandwich panels of walls and ceilings
  • Generous layout with minimum of corridors with an emphasis on maximum useable living area
  • Enough storage space in the entrance hall and in each of the living rooms
  • Passive design
  • Barrier free solution
  • Spacious, interestingly lit living room with dining and kitchen area
  • Kitchen area with bar counter for 4 people
  • Fireplace in relaxation area of the living room in contact with a corner backlighting space
  • Terrace in direct contact with a daily part of the family house, with the possibility of linking with the master bedroom and children’s room.
  • Above standard of the master bedroom consists of a generous floor space, situated in the quieter part of the house and a separate wardrobe
  • Heat pump, controlled ventilation with heat recovery
  • Practical separate technical room accessible from the corridor
  • Combination of wooden sandwich structures and the highest quality window and door panels with premium heat and technical characteristics is a prerequisite for maximum energetic modesty of the object
Type Area
Usable area 114.88 m2 + 31.53 m2
Built-up area 169.82 m2
Converted space 575.00 m3

Technical specification

  • VESTIBULE 13.07 m2
  • TECHNICAL ROOM 2.13 m2
  • ROOM 15.22 m2
  • ROOM 16.20 m2
  • BEDROOM 12.37 m2
  • WARDROBE 3.20 m2
  • BATHROOM + WC 7.02 m2
  • LIVING ROOM + KITCHEN 45.67 m2
  • OUTDOOR TERRACE 31.53 m2

Price list

Useful area alt. 1 alt. 2
House No. 2 – rough construction 114,88m2 65.900€ 53.900€
House no. 2 – whole house 114,88m2 116.900€ 124.900€
House no. 2 – turnkey 114,88m2 149.900€ 156.900€

 

A. rough construction

The construction includes:

  • bottom construction – foundation
  • wooden construction – external walls, partitions, ceiling structure, roof structure, including insulation, roofing, chimney stack, the vapour protection of the cover of FH (after the completion of the internal installations, which the builder ensures according to the instructions).

alt. 1 – foundation
alt. 2 – foundation, implementation of which the builder ensures according to the instructions of the worker of the company MM creative, s.r.o.

B. whole house
The construction includes:

  • bottom construction – foundation
  • wooden construction – external walls, partitions, ceiling structure, roof structure, chimney stack
  • roof covering
  • plastic windows with insulation triple glass,
  • treatment of surfaces – plasterboard structures of walls and ceilings in the interior, insulation of walls and plinths, including noble exterior coat,
  • indoor installations – water, sewer, gas, electricity, data transmission
  • technologies – heating by gas condensing boiler, heat recovery – alternative: heat pump heating + solar hot water heating, heat recovery

The construction does not include:

  • interior doors and frames
  • laminate flooring, ceramic floor and wall tiles
  • sanitary plumbing fixtures (toilet, batteries, etc.) and wiring (switches, sockets, lamps, etc.).
  • painting of walls and ceilings
  • gutter sidewalk, terrace, canopy over the entrance, etc..

alt. 1: heating by gas condensing boiler, heat recovery,
alt. 2: heating by heat pump + solar hot water heating, heat recovery.

C. turnkey
The construction includes:

  • bottom construction – foundation
  • wooden construction – external walls, partitions, ceiling structure, roof structure, chimney stack
  • roof covering
  • plastic (wooden) windows with insulation triple glass,
  • treatment of surfaces – plasterboard structures of walls and ceilings in the interior, insulation of walls and plinths, including noble exterior coat,
  • indoor installations – water, sewer, gas, electricity, data transmission
  • technologies – heating by gas condensing boiler, heat recovery – alternative: heat pump heating + solar hot water heating, heat recovery.
  • interior doors and frames
  • laminate flooring, ceramic floor and wall tiles
  • sanitary plumbing fixtures (toilet, batteries, etc.) and wiring (switches, sockets besides lamps, etc.).
  • painting of walls and ceilings in white
  • gutter sidewalk, terrace, canopy over the entrance, etc..

The construction does not include:

  • engineering network connections, fencing, parking area and so on.

alt. 1: heating by gas condensing boiler, heat recovery,
alt. 2: heating by heat pump + solar hot water heating, heat recovery.

Note: All vertical and horizontal bearing structures of wooden building are insulated with PUR foam and sheathed with OSB boards